Information | |
---|---|
has gloss | eng: The British Rail Class 411 (or 4 Cep) electrical multiple units were built at Eastleigh works from 1956-63 for the newly electrified main lines in Kent. These units were based on the earlier Southern Railway 4Cor design, built in 1937. |
lexicalization | eng: British Rail Class 411 |
instance of | c/British Rail electric multiple units |
Lexvo © 2008-2024 Gerard de Melo. Contact Legal Information / Imprint